
Utility-scale solar and wind doesn't get built without weeks of land prep — and doesn't stay generating without ongoing vegetation work. ALCC handles both ends of the lifecycle and everything in between.
Site prep tied to the COD calendar. O&M veg work the host community can live with. Habitat programs the lender and AHJ can sign off on.
Forestry mulching, grubbing, and rough grading on parcels from 80 acres to 2,400. Coordinated with the EPC's pile schedule and trenching plan.
Crane path, access road, and pad clearing for turbine sites. Cleared lay-down areas sized to the OEM erection footprint.
Generation-tie and collector-line ROW clearing under transmission spec — works the same way our utility crews work, with the same compliance pack.
Ongoing mow, spray, or pollinator-habitat establishment under the O&M contract. Bird-friendly seed mixes and integrated pollinator habitat options available.
Every renewable site has a commercial-operation date, and every delay costs PPA escalator dollars and tax-credit safe-harbor risk. We schedule like the EPC schedules — crews and equipment sized to the critical path, not to our weekly utilization.
