
From 12kV distribution feeders to 765kV lattice transmission, ALCC runs the full vegetation management lifecycle for investor-owned utilities, municipal systems, and electric co-ops — danger-tree audits, cycle pruning, full reclear, and emergency restoration.
One contractor owns the whole work order — walk-down through restoration. No handoffs to a sister company you've never met.
Full ROW reclear and side-trim under outage windows. NERC FAC-003 minimum vegetation clearance distance work for bulk-electric-system facilities.
Three-, four-, and five-year cycle pruning routes. Crew structures sized to your circuit map, with daily progress reporting straight into your GIS.
Hazard-tree inspection and removal off-ROW under landowner consent or wire-zone/border-zone strike-tree protocols. Photo-documented per tag.
24/7 mobilization for ice, derecho, hurricane, and ice-storm restoration. Pre-staged crews under mutual-assistance MSAs across the eastern grid.
Tree-related outages are the largest single cause of customer minutes interrupted on most distribution systems. We design the program around the SAIFI/SAIDI line on your reliability scorecard — not just the units cleared.

A representative slice of the utility standards our crews are tested and qualified against. If your standard isn't listed, we've likely worked it before — ask.
Every owner has their own spec book — minimum vegetation clearance distances, approved herbicide list, wire-zone definitions, manual-tools-only zones, landowner notification protocols, and reporting cadence. We train and audit to it.
Crews are qualified per circuit, not per region, so the gang that shows up to your job has already worked your standard.
| Specification | Range / Detail | Capacity |
|---|---|---|
| Voltage ClassTransmission & distribution corridors | 12 kV distribution through 765 kV transmission. Live-line clearance per OSHA 1910.269. All ANSI Z133 | 765 KV |
| Reliability ComplianceBulk Electric System | NERC FAC-003-5 documentation by structure, with photo evidence pack on close-out. Audit-ready | FAC-003 |
| Pruning StandardCycle work & spot pruning | ANSI A300 Part 1 directional pruning, no flush cuts, no topping. ISA-certified general foremen on every crew. A300 PT.1 | ANSI A300 |
| IVM DesignRight-of-way veg management | Mechanical, manual, and selective herbicide. EPA-certified applicators on every spray crew. Wire-zone/border-zone target-species lists per circuit. EPA Cert. | IVM |
| Cycle LengthDistribution circuits | 3-, 4-, and 5-year rotations sized to your circuit-mile budget and reliability targets. SAIFI/SAIDI | 3 — 5 YR |
| Emergency ResponseStorm & outage restoration | 24/7 dispatch with pre-staged crews under standing MSA. Mutual-assistance trained. 24 / 7 | 2-HR |
Three representative engagements with IOU and co-op clients in the last 18 months. Full case studies available on NDA-cleared request.
TransmissionEight-and-a-half miles of full ROW reclearing across mixed hardwood and ridgeline terrain — delivered inside a 22-day outage window with zero recordables.
DistributionTwelve-hundred circuit-miles of 4-year cycle pruning across six counties. SAIFI improved 18% in the first year post-cycle on the audited routes.
Storm ResponseThirteen crews mobilized inside 36 hours under a standing dispatch MSA. Worked 14 consecutive days clearing access for line crews.